Search
Search

Turner's Property Map

Loading Properties...
Tenant Fees

Fee Type

Cost £ including VAT*

Explanation

Holding Deposit

One week’s rent

A Holding Deposit is required to reserve a property.
Please note: In the event of the tenant withdrawing within 15 days of paying the Holding Deposit or failing to take up the tenancy within 15 days of paying the Holding Deposit or not complying with point 5 of the reservation receipt the tenant will forfeit their Holding Deposit.

Deposit

Five weeks’ rent

The Deposit covers damages or defaults on the part of the tenant during the tenancy

Late Rent Payment – more than 14 days

Interest at 3% above the base rate of Bank of England per annum, calculated daily.

Interest will be applied from the Rent Due Date.

Lost Key(s)

See explanation

Any cost for the replacement of keys, fobs, security devices or associated items which have been lost, damaged or broken. If the loss results in locks needing to be changed, the actual costs of a locksmith, new lock and replacement keys for the tenant, landlord and any other persons requiring keys will be charged to the tenant. If extra costs are incurred there will be a charge of £15 per hour (inc. VAT) for the time taken replacing lost key(s).

Variation of Contract (Tenant’s request and agreed by the Landlord)

£50 per agreed variation

To cover the costs of the preparation and execution of new legal documents.

Change of Sharer (Requested and replacement found by the tenant)

£50 per replacement tenant

To cover the costs of new tenant / guarantor referencing, right to rent checks, deposit registration and the preparation and execution of new legal documents.

Early Termination (Tenant’s request and agreed by the Landlord).

See explanation

Should the tenant wish to leave their tenancy agreement early, the tenant shall be liable for the costs in re-letting the property and all rent due under the tenancy until the start date of the replacement tenant. These costs will be no more than the maximum amount of rent outstanding on the tenancy.
Note: The Landlord is not legally required to agree to this request.

Company Let Application Fee

£300 per company

To cover the costs of processing a company application, includes references checks.

*VAT charged at prevailing rate
Tenant Fees

Fee Type

Cost £ including VAT*

Explanation

Holding Deposit

One week’s rent

A Holding Deposit is required to reserve a property.
Please note: In the event of the tenant withdrawing within 15 days of paying the Holding Deposit or failing to take up the tenancy within 15 days of paying the Holding Deposit or not complying with point 5 of the reservation receipt the tenant will forfeit their Holding Deposit.

Deposit

Five weeks’ rent

The Deposit covers damages or defaults on the part of the tenant during the tenancy

Late Rent Payment – more than 14 days

Interest at 3% above the base rate of Bank of England per annum, calculated daily.

Interest will be applied from the Rent Due Date.

Lost Key(s)

See explanation

Any cost for the replacement of keys, fobs, security devices or associated items which have been lost, damaged or broken. If the loss results in locks needing to be changed, the actual costs of a locksmith, new lock and replacement keys for the tenant, landlord and any other persons requiring keys will be charged to the tenant. If extra costs are incurred there will be a charge of £15 per hour (inc. VAT) for the time taken replacing lost key(s).

Variation of Contract (Tenant’s request and agreed by the Landlord)

£50 per agreed variation

To cover the costs of the preparation and execution of new legal documents.

Change of Sharer (Requested and replacement found by the tenant)

£50 per replacement tenant

To cover the costs of new tenant / guarantor referencing, right to rent checks, deposit registration and the preparation and execution of new legal documents.

Early Termination (Tenant’s request and agreed by the Landlord).

See explanation

Should the tenant wish to leave their tenancy agreement early, the tenant shall be liable for the costs in re-letting the property and all rent due under the tenancy until the start date of the replacement tenant. These costs will be no more than the maximum amount of rent outstanding on the tenancy.
Note: The Landlord is not legally required to agree to this request.

Company Let Application Fee

£300 per company

To cover the costs of processing a company application, includes references checks.

*VAT charged at prevailing rate

Keep me Informed

Fill in your personal details. We will be in touch to discuss your student property needs.

Keep me Informed

Fill in your personal details. We will be in touch to discuss your professional property needs.

Keep me Informed

Fill in your personal details and select if you are a student or professional. We will be in touch to discuss your property needs.

Before After Erleigh Road before refurbishment82 Erleigh Road Kitchen
  • 82-Erleigh-Road-lounge-2

    Lounge

  • 82-Erleigh-Road-kitchen

    Kitchen

  • 4 Bedroom Student Home – Erleigh Road

    Lounge 2

  • 82-Erleigh-Road-bedroom4

    Bedroom 1

  • 82-Erleigh-Road-bedroom3

    Bedroom 2

  • 82-Erleigh-Road bedroom2

    Bedroom 3

  • 82-Erleigh-Road bedroom1

    Bedroom 4

  • 82-Erleigh-Road-bathroom

    Bathroom

  • 82-Erleigh-Road-garden

    Garden 2

  • 82-Erleigh-Road-garden-3

    Garden 3